29-N general election in Granada How to vote, the calendar and every result since 1977
From Albolote

Albolote cleans the Pozo de la Encina riverbed to prevent flooding

The Albolote City Council clears and stabilizes one kilometre of the Pozo de la Encina ravine, next to three housing developments, ahead of heavy rains.

GranadaYa newsroom ·

Cuatro personas de pie conversando en un camino de tierra entre muros de piedra y vegetación, una con chaleco reflectante amarillo.
Photo: Pepe Vaquero

The urbanizaciones of El Cortijo del Aire, Villas Blancas and Loma Verde, in Albolote, have had a clearer ravine since these days. The Town Council's Environment department is cleaning, clearing and stabilising the slopes of the Pozo de la Encina channel, which runs past the three of them. The work aims to reduce the risk of overflow if episodes of heavy rain occur.

The accumulation of branches, brush and waste materials was slowing the natural flow of water at several points. That circumstance had raised concern among residents about the possibility of bad weather. The work is intended to improve the water outlet and reduce the risk of flooding around these three urbanizaciones, as the Town Council details.

One kilometre of channel in three sections

The intervention covers three sections of 400, 100 and 500 metres, in total one kilometre of channel. To be able to work, access points have been set up allowing the passage of a seven-tonne rotating excavator, equipped with tools to clear, clean and remove the heaviest and most embedded debris.

The company in charge of carrying out the work is Nacimiento, Infraestructuras y Medio Ambiente. Its site manager, Raúl López, explained that the work is progressing from upstream to downstream, following the natural direction of the current.

The mayor, Salustiano Ureña, said that the intervention strengthens the safety of the urbanizaciones in situations of adverse weather. He also indicated that obtaining the necessary authorisations has not been easy, because it is up to the Confederación Hidrográfica del Guadalquivir to grant the permits for this type of action. Ureña added that, when this work is finished, the Town Council will study requesting new authorisations to act in other parts of the municipality.

The councillor for Environment, Rosario Ramírez, stressed the preventive nature of the project and the concern about the state the channel was in given the possibility of facing a period of intense rain.

Share this story

Shall we let you know what matters?

Phone alerts

Change or remove it in my alerts