29-N general election in Granada How to vote, the calendar and every result since 1977

The Port of Motril brings its industrial land of more than 543,000 metres to Fruit Attraction

Topics Autoridad Portuaria de Motril Puerto de Motril

The Port Authority of Motril is taking part in Fruit Attraction 2026, at IFEMA (Madrid), to present its logistics offer and the more than 543,000 square metres of industrial land planned on the Logistics Activities Zone.

GranadaYa newsroom ·

Un grupo de hombres trajeados posa tras una pancarta con el lema GRANADA FUERZA COOPERATIVA en un recinto ferial con expositores.
Photo: Autoridad Portuaria de Motril

The Port of Motril is taking part once again in Fruit Attraction 2026, the international fruit and vegetable sector trade fair held at IFEMA in Madrid. The Port Authority attends with the aim of showcasing its logistical potential to operators from all over the world.

Industrial land next to the logistics area

Among the arguments presented by the Motril dock is the Partial Plan for PUE-1, located right above the port's Logistics Activities Zone. According to the Port Authority, the Junta de Andalucía has given this plan its definitive boost, an urban development and business operation covering more than 543,000 square metres of industrial land intended for large distribution and logistics companies connected with maritime traffic.

Maritime connections and carbon footprint

During the three days of the fair, the port's delegation will focus on its maritime connections and its location as an intermodal transport alternative towards North Africa. The president of the Port Authority, José García Fuentes, has stated that the use of the motorways of the sea makes it possible to reduce the carbon footprint of agricultural products compared with road-only transport.

Support for the agricultural sector

The port's institutional presence at the fair also serves to back the demands of the region's agricultural sector. The Port Authority accompanies farmers and irrigators in raising the visibility of demands such as progress on the pipelines of the Béznar-Rules reservoir system.

Share this story

Shall we let you know what matters?

Phone alerts

Change or remove it in my alerts

What it's about

Economy and employment